Skip to the page
RUST ANALYTICS
LIVE35,701PLY11,452SRV
QUOTE 80.221.91.195:28015 Offline checked 11d ago

MS Project | SOLO/DUO

moddedcarbon
Players · last
0/ 25
n/a24h
0% full
Players · 24 hourshourly average, then now · dashed: 24 hours ago
No hourly readings in the last 24 hours.
Launch Rust and join

Key statistics

the figures behind the quote
Players now
0/ 25
0% full
Change · 24h
n/a
no reading a day ago
7-day average
0
peak –
Rank
#15,948
top 70%
Rank · 7d ago
#10,711
5237 places down
Last wipe
17d ago
no schedule published
Next wipe
–
too few wipes seen yet
Group limit
8
8, the default
Gather rate
–
no rate in the name
Score
0
player hours, last seven days
Map
3500
Procedural Map · seed 789936933
First seen
13 Sep 2026
no hostname published

Players

No hourly history yet.

Hourly average and peak, UTC.

Server performance

This server has not answered a direct query in the last 48 hours.

48 hours: hourly readings. 30 to 90 days: one point a day, with the day's average and lowest fps, most entities and most memory, measured since 17 Sep. From asking the server directly; low fps and a climbing entity count mean lag.

Rank

daily · 1 is best
RankRank in region
15k10k15k20k20 Sep24 Sep28 Sep1 Oct5 Oct9 Oct

Top 70% of all ranked servers. Ranked on player hours over the last seven days.

Wipe schedule

too few wipes seen yet

Not enough wipes seen yet to tell when the next one is. Every server wipes at the monthly force wipe.

usual gap
8.5 days
between real wipes
wipe-day peak
1
players, last three wipes
crowd held
0%
else halves by day 1

The first 48 hours of its last wipes

Sat 26 SepThu 17 Sep
00.250.50.751+0h+9h+19h+28h+38h+47h

Players each hour, from the hour of the wipe. The latest peaked at 1, 0 hours in.

Wipes

newest first
WipedPeakCrowdLastedPlayers before
Sat 26 Sep, 09:07 UTC17d ago 1 – running 1
Thu 17 Sep, 20:03 UTC26d ago 1 halved by day 1 8.5 days 0

Peak: the most players in the first 48 hours. Crowd: whether every day of the wipe kept at least half that peak, or the day it fell below. A new world less than six hours after a wipe is a restart, not a wipe of its own.

Similar servers

the same kind of game, then region, group limit, rate and wipes
#ServerLastChg 24hPlayers over the last 24 hours24h
1ShockRust | Blue | NoLimitno group limit · 128 on average58/300−41−41.4%
2RETRO RUST #1 Х1000|NOLIMIT|LOOT++|KIT WIPE 13.10EU · groups of 16+ · weekly · 108 on average49/225−12−19.0%
3МИНИ-КАРТА 2Х | STORM | FPS+ 10.10EU · groups of 8+ · weekly · 90 on average88/100−3−3.0%
4404 RUST 2Х|ДЛЯ НОВИЧКОВ|РУССКИЙ 10.10EU · groups of 16+ · monthly · 85 on average17/1000−18−50.7%
5404 RUST 2Х|ДЛЯ НОВИЧКОВ|РОССИЯ 08.10EU · groups of 16+ · monthly · 76 on average9/1000−8−47.3%
6404 RUST 2Х|ДЛЯ НОВИЧКОВ|EU MAIN 11.10EU · groups of 16+ · monthly · 73 on average17/700−42−71.4%

Quick answers

from the figures on this page

Map and Rules

What settings and rules are in place on MS Project | SOLO/DUO?

The name of MS Project | SOLO/DUO carries no gather rate. Groups can contain a maximum of 8 players, the default for the game. survival is the mode, gather, build and raid in the standard game. Combat and raiding between players are allowed. Modded is its category in the server browser; plugins or settings modify the game. Carbon plugins are running. VAC, Valve's anti-cheat, is enabled.

What is the current map on MS Project | SOLO/DUO?

The map on MS Project | SOLO/DUO is procedural, size 3,500, with seed 789936933, and generated by the game. You can see the map on RustMaps from this page, as the same size and seed give the same map.

Population

What position does MS Project | SOLO/DUO hold in the server rankings?

For the last seven days, MS Project | SOLO/DUO holds rank #15,948 on player hours, in the top 70% of all ranked servers.

How many players does MS Project | SOLO/DUO have?

Right now, MS Project | SOLO/DUO is offline; the last sighting was 11 days 10 hours ago.

Wipe Cycle

How does MS Project | SOLO/DUO handle wipe day?

Recent wipes at this server drew an average peak of 1 players. 0 hours after the latest wipe, the crowd reached its peak. Recent wipes kept the crowd above half the peak until the next wipe 0% of the time. If it did not hold, by day 1 the crowd dropped below half.

On what cycle does MS Project | SOLO/DUO wipe?

There are too few wipes on record for MS Project | SOLO/DUO to reveal its rhythm. The monthly force wipe applies to every Rust server. The next one falls on Thursday 5 November at 19:00 UTC. Its world now is 17 days 22 hours old.

Server Overview

What is the location of MS Project | SOLO/DUO?

For MS Project | SOLO/DUO, no region is published. Rust Analytics reports the location a server claims, not the machine's actual location. You can reach it at 80.221.91.195:28015.

MS Project | SOLO/DUO is on which Rust version?

The build is Rust network protocol 2633 and build 162929 on Linux, running on MS Project | SOLO/DUO. Your game needs the same protocol to get in; Steam takes care of the update.

Is MS Project | SOLO/DUO up, and how consistent is its uptime?

No response from MS Project | SOLO/DUO. It was last seen 11 days 10 hours ago. The last 7 full days give 0% uptime, 0 hours on out of 168. 13 September 2026 is when Rust Analytics first saw it.

Server Tags

What is the meaning of the tags on MS Project | SOLO/DUO?

Published by MS Project | SOLO/DUO for the game's server browser to read: gmrust (Game mode): Rust's standard survival mode; mp25 (Max players): Slot count: 25; ts8 (Group limit): At the game default, teams hold up to 8; v2633 (Protocol): To join, your game needs protocol 2633; cs162929 (Build): It runs build 162929; ptrak (Networking): RakNet, the network layer the game ships with; $r? (Region code): No region code has been set; ^z (Modded): Modded listing: the game is changed by plugins or settings; ^y (Carbon): The plugin framework here is Carbon. Also in the tags and at the top of this page: current players, queue and world creation time.

Where does MS Project | SOLO/DUO show up in Rust Analytics lists and filters?

On Rust Analytics, MS Project | SOLO/DUO matches these lists: Modded Rust servers. These filters bring it up on the server list: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more.

Connection

What steps do I take to join MS Project | SOLO/DUO?

Type client.connect 80.221.91.195:28015 after pressing F1 in Rust to open the console. The Launch Rust button on this page does the same, opening Rust through Steam and connecting you.

Server tags

what each one means

Published as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y

Game

gmrust
Game mode Rust's standard survival mode.
mp25
Max players Slot count: 25.
ts8
Group limit At the game default, teams hold up to 8.
v2633
Protocol To join, your game needs protocol 2633.
cs162929
Build It runs build 162929.
ptrak
Networking RakNet, the network layer the game ships with.
$r?
Region code No region code has been set.

Mods and access

^z
Modded Modded listing: the game is changed by plugins or settings.
^y
Carbon The plugin framework here is Carbon.

Players now (cp), the queue (qp) and the wipe time (born) are in the tag string too; they change every few minutes and are shown at the top of the page. Flag meanings are Facepunch's.